Third Production Line Coming Soon

The planned expansion of Champion Fiberglass’s facilities is on track for groundbreaking this January. The addition of a third production line will functionally double our output and allow us to meet growing demand – this production line will be fully operational some time between April and June of 2019.

The third production line will feature advancements including a double winder (vs. our other two lines’ single winders), a 40-foot drying oven and 12-foot quench tank (doubling the lengths of those of Lines 1 and 2), and a faster puller system.

Once Line 3 is operational and functioning at its maximum output, we’ll be retrofitting Lines 1 and 2 with these advancements. These upgrades are just one feature of our commitment to greater production capability, speed, and quality. Since 2016’s rebuild, the facility’s output has increased by 25% – the new line promises to up that production capability by an additional 50%. As demand increases, Champion Fiberglass intends to stay ahead of it in order to meet your needs.

Keep Reading
Jan 21, 2025
Meet Engineering Assistant Andrea Velasco

She’s a DIYer and a Traveling Texans Fan. Get to Know Engineering Assistant Andrea Velasco

Jan 14, 2025
Large Electrical Contractor Experiences Safe, Successful Fiberglass Conduit Installation Including Prefabrication for a Data Center Customer

Challenge A large data center project in Virginia’s Data Center Alley required miles of electrical conduit, including duct banks that…

Dec 11, 2024
Benefits of Working with Prefabricated Electrical Conduit

Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.