Third Production Line Coming Soon

The planned expansion of Champion Fiberglass’s facilities is on track for groundbreaking this January. The addition of a third production line will functionally double our output and allow us to meet growing demand – this production line will be fully operational some time between April and June of 2019.

The third production line will feature advancements including a double winder (vs. our other two lines’ single winders), a 40-foot drying oven and 12-foot quench tank (doubling the lengths of those of Lines 1 and 2), and a faster puller system.

Once Line 3 is operational and functioning at its maximum output, we’ll be retrofitting Lines 1 and 2 with these advancements. These upgrades are just one feature of our commitment to greater production capability, speed, and quality. Since 2016’s rebuild, the facility’s output has increased by 25% – the new line promises to up that production capability by an additional 50%. As demand increases, Champion Fiberglass intends to stay ahead of it in order to meet your needs.

Keep Reading
Dec 11, 2024
Benefits of Working with Prefabricated Electrical Conduit

Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Dec 11, 2024
Meet Engineering Assistant Tim Deasy

In his spare time he enjoys football, grilling and shooting pool. He also designs and builds furniture. Get to know…

Dec 10, 2024
Carlson Sales and Champion Fiberglass® Rapidly Expanding into Electrical Utility Projects 

Multiple utility projects switch to Champion FIberglass products for easier implementation and lower costs  Since its initial partnership with Champion…