Challenge

A large data center project in Virginia’s Data Center Alley required miles of electrical conduit, including duct banks that needed to be installed on a tight, strict timeline. The data center customer also insisted on performance materials and cost efficiency.

The contractor, Rosendin Electric, is an expert in below-ground data center installation, but this was the first time installing large quantities of fiberglass conduit. Specs for the comprehensive installation included 25 miles of 4”, 5” and 6” heavy wall 90s for medium voltage telecom and house transformer duct banks.

Buried fiberglass conduit going into a vault.

Solution

The data center customer evaluated fiberglass and PVC conduit for the project. Fiberglass was preferred over PVC for the following reasons:

• Lighter weight – 66% less – saved installation time. And because there was less time in the trench, installation was safer for installers

• At the time, fiberglass conduit materials cost almost 50% less than PVC, and labor savings was even greater

• Lead time was about 25% shorter, which helped the project stay on schedule

• Champion Fiberglass® conduit has a higher temperature rating (110ºC) vs PVC (90ºC)

Results

Many advantages were realized for this project including less man-power, smaller equipment, and safer installation due to the conduit’s lighter weight, fault resistance, and increased distance between supports. Additionally, prefab assembly by Champion Fiberglass helped shorten the installation process tremendously.

Pre-assembled duct banks were delivered, then the lightweight duct banks were easily placed into the trench with a forklift, something that would not have been possible with heavier PVC conduit.

This project also involved a high level of customer support. Champion Fiberglass provided installation guidance for the contractor to become familiar with fiberglass conduit for installation. Champion Fiberglass regularly goes the extra mile for customers, and there were many touchpoints including conference calls, samples and customizations.

The project concluded with these results:

• Total labor savings was 60% 

• A 63% increase in productivity over PVC

• The project was completed on-time and on-budget


Recent Blogs
Jun 18, 2025
How to Calculate Electrical Labor Cost

By Scott Patchan Estimating labor costs is essential – labor can have a significant impact on an electrical project’s bottom…

Jun 16, 2025
Rep Ambassador: Gumersell Cashdan’s Mike Frobosilo

Meet Mike Frobosilo, Technical Sales Specialist for Gumersell-Cashdan, a seasoned agency with over 90 years in the electrical industry, serving…

Jun 10, 2025
Introducing the 2025 Summer Interns

At Champion Fiberglass®, we’re always excited to train the next generation. It’s important to us to pass along valuable lessons…