The planned expansion of Champion Fiberglass’s facilities is on track, and our groundbreaking will be taking place soon. The addition of a third production line will functionally double our output and allow us to meet growing demand. The third production line will feature advancements including a double winder (vs. our other two lines’ single winders), a 40-foot drying oven and 12-foot quench tank (doubling the lengths of those of Lines 1 and 2), and a faster puller system.

Once Line 3 is operational and functioning at its maximum output, we’ll be retrofitting Lines 1 and 2 with these advancements. These upgrades are just one feature of our commitment to greater production capability, speed, and quality.

Keep Reading
Jul 17, 2024
Champion Fiberglass® Named a CompositesWorld Top Shop for 2024

The origins of fiberglass date back to the ancient Greeks. Today fiberglass is used for a variety of applications from…

Jul 15, 2024
Get to Know Research and Development Engineer Blake Rogers

He’s got a diverse background in engineering, is new to Texas and can juggle. Meet Blake Rogers.

Jul 15, 2024
Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and…