The planned expansion of Champion Fiberglass’s facilities is on track, and our groundbreaking will be taking place soon. The addition of a third production line will functionally double our output and allow us to meet growing demand. The third production line will feature advancements including a double winder (vs. our other two lines’ single winders), a 40-foot drying oven and 12-foot quench tank (doubling the lengths of those of Lines 1 and 2), and a faster puller system.
Once Line 3 is operational and functioning at its maximum output, we’ll be retrofitting Lines 1 and 2 with these advancements. These upgrades are just one feature of our commitment to greater production capability, speed, and quality.
Keep Reading
Will Epoxy Cure in Cold Weather?
Yes. Get all the details regarding ambient temperature and epoxy curing for your next installation.
Alliance Marketing Educates for Project Success in British Columbia
Transportation Focus Feeds Success
Considerations for Exposed Conduit
In applications where exposed conduit may be present there are several special considerations that project managers and engineers must consider.