Challenge

A large data center project in Virginia’s Data Center Alley required miles of electrical conduit, including duct banks that needed to be installed on a tight, strict timeline. The data center customer also insisted on performance materials and cost efficiency.

The contractor, Rosendin Electric, is an expert in below-ground data center installation, but this was the first time installing large quantities of fiberglass conduit. Specs for the comprehensive installation included 25 miles of 4”, 5” and 6” heavy wall 90s for medium voltage telecom and house transformer duct banks.

Buried fiberglass conduit going into a vault.

Solution

The data center customer evaluated fiberglass and PVC conduit for the project. Fiberglass was preferred over PVC for the following reasons:

• Lighter weight – 66% less – saved installation time. And because there was less time in the trench, installation was safer for installers

• At the time, fiberglass conduit materials cost almost 50% less than PVC, and labor savings was even greater

• Lead time was about 25% shorter, which helped the project stay on schedule

• Champion Fiberglass® conduit has a higher temperature rating (110ºC) vs PVC (90ºC)

Results

Many advantages were realized for this project including less man-power, smaller equipment, and safer installation due to the conduit’s lighter weight, fault resistance, and increased distance between supports. Additionally, prefab assembly by Champion Fiberglass helped shorten the installation process tremendously.

Pre-assembled duct banks were delivered, then the lightweight duct banks were easily placed into the trench with a forklift, something that would not have been possible with heavier PVC conduit.

This project also involved a high level of customer support. Champion Fiberglass provided installation guidance for the contractor to become familiar with fiberglass conduit for installation. Champion Fiberglass regularly goes the extra mile for customers, and there were many touchpoints including conference calls, samples and customizations.

The project concluded with these results:

• Total labor savings was 60% 

• A 63% increase in productivity over PVC

• The project was completed on-time and on-budget


Recent Blogs
Nov 18, 2025
Champion Fiberglass® XUR Named a 2025 NECA Showstopper

HOUSTON (November 12, 2025) – Champion FiberglassⓇ is excited to share that the new Expandable Utility Riser™ is a 2025…

Nov 14, 2025
How to Cut Conduit: Fiberglass Cutting Tools

Learn how to cut fiberglass conduit safely and efficiently. Explore recommended tools, PPE, and expert field-cutting tips.

Nov 14, 2025
Champion Fiberglass® Welcomes EMS Partners

Champion Fiberglass welcomes EMS Partners as its new C&I representative across the Upper Midwest, expanding conduit and duct support for…