EPOXY FIBERGLASS
PVC SCH 40
PVC SCH 80
GALVANIZED RIGID STEEL
PVC COATED STEEL
ALUMINUM

NECA LABOR INSTALLATION RATES

(Normal installation hours per/100 ft) (REF: 2019-2020 NECA Manual
of Labor Units)

*Reduce labor units by 10% for 20-foot lengths
3 ⁄ 4“5.54.55.46.08.05.5
1″5.85.36.37.010.06.0
1146.0*6.07.28.012.06.5
1126.4*7.08.49.015.07.0
2″6.8*8.09.611.018.08.0
2127.1*9.010.815.021.010.0
3″7.5*10.012.020.026.012.0
3127.9*12.0N/A25.032.015.0
4″8.3*14.016.830.038.019.0
5″8.6*18.021.638.045.024.0
6″9.0*24.028.848.060.030.0